ºÚÁÏÍø

APPLY TO MESSIAH

ECC Lottie Dining Room Scramble Area

January 2010 -

The new ceiling and lighting was installed in scramble area.  Cost savings have not been realized yet but will be next time we get electric bill.

December 2009 -

During Christmas break, the Lottie Dining Room Scramble Area/Serving Area will receive a new ceiling and lighting.  The new ceiling will help absorb noise while new lighting is more energy efficient and will save the College money.

Picture 1

Picture 2