ºÚÁÏÍø

APPLY TO MESSIAH

Covered Bridge Repairs

December 2009 -

Repairs were made to covered bridge during Thanksgiving break.  These repairs helped to maintain structure stability of bridge and prevent future damage to bridge and vehicles.

November 2009 -

The recent accident at the covered bridge will cause the bridge to be closed down Friday, November 27, 2009 and Saturday, November 28, 2009.  The repairs will try to maintain the historic nature of the bridge but at the same time prevent future damage.

Picture 1

Picture 2